Gleason Grade logo Gleason GradeGetting the grade right

Civil engineer and drainage writer, page 7 of 8

Marisela Ortiz

Marisela spent eleven years stamping site plans for a municipal engineering firm before she got tired of watching good drainage designs get value-engineered out of the final build. She writes about the gap between a stamped plan and what actually gets graded.

Civil engineer and drainage writer, page 7 of 8

grid pattern for Technology in Modern Site Grading Grading Equipment

Technology in Modern Site Grading

Site grading looks like one of the most physical, old-fashioned trades there is, earth moved by heavy machines, and in one...

Marisela OrtizSep 16, 20264 min read
Warm rust colored prism pattern suggesting two very different price tags Grading Equipment

The Real Odds Behind a Cheap Grading Quote

Three quotes came in on a job I was competing for last year: mine, one close to it, and one nearly 40 percent lower than both.

Marisela OrtizSep 15, 20264 min read