Gleason Grade logo Gleason GradeGetting the grade right

Civil engineer and drainage writer, page 6 of 8

Marisela Ortiz

Marisela spent eleven years stamping site plans for a municipal engineering firm before she got tired of watching good drainage designs get value-engineered out of the final build. She writes about the gap between a stamped plan and what actually gets graded.

Civil engineer and drainage writer, page 6 of 8

Illustration of an operation being overseen and organised Games

Management Simulation Games, Explained

A management simulation game puts you in charge of running something, such as a place, an operation or an organisation,...

Marisela OrtizOct 9, 20264 min read
orbit pattern for The Grading Contractor's Fleet Is the Business Grading Equipment

The Grading Contractor's Fleet Is the Business

A grading contractor's business runs on machinery and vehicles, the excavators, dozers, and trucks that move the earth and get...

Marisela OrtizSep 25, 20265 min read